When Is the Right Time to Order Steel Beams for Your Building Project?
When Is the Right Time to Order Steel Beams for Your Building Project?
Whether you’re planning a home extension, a loft conversion, or a commercial building project, steel beams play a critical role in the structure of a building. Ordering them at the right time is essential to avoid delays, unnecessary costs and disruption on site.
This guide explains when steel beams should be ordered, what needs to be in place beforehand, and how both homeowners and commercial project teams can plan effectively.

Why Steel Beams Are So Important
Steel beams (often referred to as RSJs in domestic projects) are used to:
Support load-bearing walls
Create open-plan spaces
Carry floor and roof loads
Strengthen structures during alterations
Because steel beams are structural elements, they are usually custom specified and fabricated to order, meaning timing is crucial.
Ordering too early can lead to incorrect specifications. Ordering too late can halt the entire project.
What Must Be Done Before Ordering Steel Beams
1. Structural Engineer’s Calculations
Before any steel can be ordered, a structural engineer must complete calculations. These confirm:
Beam size and type
Load requirements
Bearing details and connections
This applies to both domestic and commercial projects.
2. Finalised Drawings
Architectural drawings should be confirmed before ordering steel. Late design changes can affect beam sizes, positions or quantities.
3. Planning Permission and Building Control
Most projects involving steel beams require building control approval. In commercial projects, this may also involve coordination with project managers and principal contractors.
When Is the Right Time to Order Steel Beams?
The Ideal Time
Steel beams should be ordered:
Once structural calculations are approved
Once drawings are finalised
Several weeks before installation is required
This allows time for fabrication, delivery planning and coordination with site works.
Typical Lead Times
While this varies, typical lead times are:
Standard beams: 1–2 weeks
Beams requiring fabrication (plates, holes, welds): 2–4 weeks
Large commercial projects: project-specific timelines
Always confirm lead times early to avoid programme clashes.
Domestic vs Commercial Considerations
For Homeowners
Homeowners often encounter steel beams during:
Extensions
Loft conversions
Removing load-bearing walls
Early coordination between the engineer, builder and building control helps prevent delays and unexpected costs.
For Commercial Projects
Commercial projects often involve:
Multiple beams
Complex connections
Crane lifts and restricted access
Steel beams frequently sit on the critical path, meaning delays can impact multiple trades and the overall programme.
Common Mistakes to Avoid
Ordering steel before calculations are final
Leaving steel orders too late
Not planning delivery and access
Failing to coordinate inspections
Underestimating fabrication lead times
Good planning avoids costly rework and downtime.
Preparing for Steel Beam Installation
Before beams arrive on site:
Ensure access is clear and suitable
Lifting equipment is arranged
Temporary supports are planned
The site is ready for immediate installation
Building control will usually need to inspect the steel before it is covered.
Frequently Asked Questions About Steel Beams
Do I need a steel beam in my project?
If you are removing a load-bearing wall, extending a building or altering the structure, a steel beam is usually required. A structural engineer will confirm this.
What is an RSJ?
RSJ stands for Rolled Steel Joist. It’s a common term used to describe structural steel beams, particularly in domestic projects.
Can steel beams be ordered before approval?
It’s best to wait until structural calculations are complete and accepted. Ordering too early risks incorrect sizing or costly changes.
How long does it take to get steel beams made?
Standard beams: 1–2 weeks
Fabricated beams: 2–4 weeks
Complex commercial projects may require longer lead times.
Who installs steel beams?
Steel beams should be installed by competent builders or specialist contractors, often using lifting equipment. Building control inspections are usually required.
Do steel beams need fire protection?
Yes. In most cases, steel beams must be fire protected (for example, boxed in with fire-rated materials) to meet building regulations.
How much do steel beams cost?
Costs vary depending on:
Size and weight
Fabrication requirements
Delivery and installation
Domestic beams may start from a few hundred pounds, excluding installation.
What happens if steel beams are ordered late?
Late ordering can delay:
Structural works
Inspections
Follow-on trades
This often increases overall project costs.
Final Thoughts
The right time to order steel beams is after designs and approvals are complete, but well before they are needed on site. Early planning keeps projects on schedule, controls costs and avoids unnecessary stress—whether you’re a homeowner or managing a large commercial build.
If you’re unsure about timing, specifications or coordination, seeking professional advice early can make all the difference.
SERV Contracts LTD
Address: Unit 49, The Elms Industrial Estate, Cranfield Park Road, Wickford, Essex, SS12 9EP, United Kingdom
Phone: 01268 975006
Email: [email protected]
Website: www.servcontracts.co.uk