Repairing metalwork in an empty building site is one thing. Doing it inside a working bookshop in central London, surrounded by paper stock and covered by a live fire detection system, takes more planning. That was the job when RA Interiors brought SERV Contracts in to carry out handrail repairs at Waterstones on Gower Street, Bloomsbury.

Client Type
Commercial retail, delivered as a subcontractor to fit-out contractor RA Interiors.
Location
Waterstones, Gower Street, Bloomsbury, London.
The Challenge
The handrails needed repair work that involved hot works. That would be routine in a fabrication workshop. In a bookshop, it needed careful control.
Several factors had to be managed together:
Fire risk. Hot works close to large quantities of books, shelving and furniture had to be properly controlled.
Live fire detection. The smoke detectors in the work area would be set off by heat and fumes unless they were isolated and then reinstated in a controlled way.
A trading environment. The works had to be planned around the store’s staff, stock and day-to-day operation.
Working as a subcontractor. Everything had to fit within RA Interiors’ wider programme and site procedures.
The Solution
Before work started, SERV Contracts produced a detailed Risk Assessment and Method Statement (RAMS) for the project. It included hot works permits and set out clearly who was responsible for what.
We agreed the site arrangements with the client in advance:
Books, furniture and other movable items were cleared from the immediate work area before we arrived.
A named site contact met our team on arrival and handled access.
Smoke detectors in the work area were isolated for the duration of the hot works and reinstated once the works were finished.
Securing and locking up the site after works were agreed in advance.
With those arrangements in place, our team could carry out the repairs safely and efficiently. The handrails were then restored to a sound, serviceable condition.
Works Carried Out
Handrail repair works
Hot works carried out under a formal permit system
A project-specific RAMS, including customer responsibilities and fire precautions
Coordination with the main contractor and store management
Benefits Delivered
Safe handrails restored in a public area with heavy footfall.
Fire risk controlled. Hot works were managed under permit in a building full of combustible stock.
No false fire alarms. Planned isolation and reinstatement of the detectors avoided unwanted alarm activations.
A straightforward subcontract for RA Interiors. Clear paperwork, agreed responsibilities and a team that worked within the main contractor’s procedures.
Interesting Technical Details
The most important part of this job happened before anyone picked up a tool. Hot works permits are only effective when the conditions they rely on are actually in place on the day.
On this job, that meant three things were confirmed in advance:
Combustible stock was cleared from the area.
The relevant detectors were isolated.
The client knew to reinstate fire protection once the works were complete.
Writing these conditions into the RAMS as named customer responsibilities, rather than leaving them as assumptions, removed any doubt about who was doing what. That kind of preparation is what lets hot works go ahead safely in sensitive environments such as retail stores, libraries, offices and heritage buildings.
Outcome
The handrails at Waterstones Gower Street were repaired and returned to safe use, with no compromise to fire safety or the store’s operation. RA Interiors had a subcontractor that handled its own planning, documentation and site coordination. That allowed RA Interiors to concentrate on the wider project.
Why Choose SERV Contracts
SERV Contracts works with main contractors, fit-out specialists and property managers across London and the South East. We deliver metalwork, fabrication, security and repair works. We know that on a contractor-led project, a subcontractor’s paperwork and planning matter as much as their workmanship. Every job starts with understanding the site, the risks and the programme, and finishes with work you don’t have to check twice.
Frequently Asked Questions
Can you carry out hot works in occupied or trading buildings?
Yes. With a project-specific RAMS, a hot works permit and the right site preparation agreed in advance, hot works can be carried out safely in live environments such as shops, offices and public buildings.
What will I need to do before your team arrives?
Usually we ask you to clear movable items from the work area, provide a site contact, arrange for any smoke detectors to be isolated, and agree how the site will be locked up afterwards. We set all of this out clearly in our RAMS so there are no surprises on the day.
Do you work as a subcontractor for fit-out and main contractors?
Yes. We regularly work alongside main contractors and interior fit-out companies, working within their programme, procedures and site rules.
Do you only repair handrails, or can you fabricate new ones?
Both. We repair existing handrails and balustrades, and we can design and fabricate new metalwork when a repair isn’t the right long-term answer.
Get in Touch
Do you have metalwork repairs planned in an occupied building, or need a reliable subcontractor for your next fit-out? Speak to our engineering team, and we’ll plan the works around your site.
📞 01268 975006
✉️ [email protected]
🌐 www.servcontracts.co.uk